Please Accept our Privacy Policy
Employer: PSA Ventures, Inc
Sr. Project Scheduler, Master’s degree with 6 months of experience in Civil Engineering; Apply project scheduling and planning skills to develop and maintain integrated schedules for electric transmission line and substation projects using Primavera P6, utilizing Critical Path Method (CPM) and schedule logic optimization techniques; Apply technical skills in AutoCAD and Civil 3D to analyze civil design data and support engineering-based planning, constructability assessments, and execution strategies; Employ advanced data analysis and reporting skills using Microsoft Excel and Power BI to develop planning dashboards, performance metrics, and risk analysis reports for engineering and management review; Apply geospatial analysis and mapping skills using AGIS and Google Earth Pro to evaluate transmission corridors, access routes, staging areas, and spatial constraints affecting civil construction planning; Develop and manage GIS and KMZ planning files to support field execution strategies, right-of-way coordination, and alignment between engineering design and construction planning; Maintain and manage planning and scheduling data using PeopleSoft, Team Member, and internal enterprise systems, applying attention to detail and compliance knowledge to meet corporate governance requirements. Skills- Primavera P6, CPM, AutoCAD and Civil 3D, Power BI, AGIS and Google Earth Pro, GIS and KMZ, PeopleSoft. Skills- Primavera P6, CPM, AutoCAD and Civil 3D, Power BI, AGIS and Google Earth Pro, GIS and KMZ, PeopleSoft. Must be willing to travel and/or relocate to various worksites throughout the U.S., including Uniondale, NY 11556, Corona, NM 88318 and Johnstown, Ohio 43031. No telecommuting. Travel may occur approximately one to two times per month, or more frequently as needed depending on project assignments and business requirements. This represents approximately 20% of the beneficiary's work time. Send resume to PSA Ventures LLC, 7541 Mentor Ave, STE A102-3, Mentor, OH 44060.