We use essential cookies

Please Accept our Privacy Policy

Senior Project Scheduler

Graham & Associates, Inc.

Tucker, GA 30084 • 10/11/2026

Job Description

Job Description
Description:

Salary Range: $125,000-$135,000

JOB SUMMARY:

Graham & Associates is currently seeking a career-minded Senior Project Scheduler with experience in heavy civil/infrastructure/transportation projects. This position will be tasked with scheduling multi-project work programs, including the development, monitoring, updating, reporting, and presentation of project plans and schedules.

ESSENTIAL DUTIES/RESPONSIBILITIES:

  • Develops and updates summary level as well as detailed schedules for multiple concurrent projects.
  • Review consultant and contractor-prepared schedules and provide analysis to project stakeholders.
  • Assign resources (cost, labor, or material) to activities and develops cash flow reports and resource histograms.
  • Evaluate critical and near-critical path activity sequences.
  • Determine reasonable schedule logic and constraints based on discussions with task owners and/or teams.
  • Identify schedule changes and trends
  • Develop earned value reports
  • Develop lists of design, procurement, construction, and post-construction activities based on the review of design documents, examination of site conditions, and discussions with Owners, design consultants, and contractors.
  • Identify major milestones, critical approvals, and long lead procurement items.
  • Develop realistic activity durations based on production rates and available manpower based on discussions with task owners and/or teams.
  • Evaluate critical and near-critical path activity sequences.
  • Determine reasonable schedule logic and constraints based on discussions with task owners and/or teams.
  • Assess actual progress based on on-site inspections.
  • Prepare post-construction as-built schedules and lessons learned reports.
Requirements:

KNOWLEDGE, SKILLS, & ABILITIES:

EDUCATION: Bachelor’s Degree in Engineering, Construction Management, or related field.

EXPERIENCE:

  • Ten years' relevant experience • Strong technical, organizational, and coordination skills.
  • Ability to provide independent schedule analysis, contractor schedule review, and executive summary reporting.
  • Must have a strong understanding of CPM (Critical Path Method) concepts and calculations.
  • Strong understanding of earned value concepts, calculations, and rules of credit.
  • Must be highly articulate, have a clear and analytical approach to problem-solving, and have strong decision-making abilities.
  • Must have excellent communication and presentation skills.
  • Experience with transportation projects including sidewalks, streetscapes, intersection improvements, bridge, and roadway improvements is preferred.

EQUIPMENT/SOFTWARE REQUIREMENTS:

  • Advanced knowledge in Primavera (P6) and Microsoft Project • Proficient in MS Word, Excel, Outlook, and PowerPoint. • Strong technical, organizational, and time management skills.

WORK ENVIRONMENT:

This job operates primarily in a professional office environment. This role routinely uses standard office equipment such as computers, phones, photocopiers, filing cabinets, and fax machines.

PHYSICAL REQUIREMENTS:

The physical demands described here are representative of those that must be met to successfully perform the essential functions of the job. Reasonable accommodations may be made to enable qualified individuals with disabilities to perform essential functions, provided such accommodations do not create an undue hardship for the Company. This position requires sedentary work which involves:

  • Sitting most of the time exerting up to 10 pounds of force occasionally and/or a negligible amount of force frequently or constantly to lift, carry, push, pull, or otherwise move objects, including the human body.
  • Other physical activities may include lifting, using fingers (grasping, feeling), talking, hearing, reaching, standing, crouching, kneeling, stooping, and close visual acuity