Please Accept our Privacy Policy
Power the future of space at Star Catcher
Star Catcher is building the first energy grid in space to power the orbital economy.
Today's spacecraft must generate all of their own power, which caps what they can do and how long they can operate. But what if they could "plug" into a grid, the way buildings do on Earth? Instead of cables and outlets, Star Catcher is building the technology to wirelessly beam energy to spacecraft's existing solar panels when and where they need it.
Be an early member of a team building an entirely new energy infrastructure at scale to power the next frontier.
Star Catcher Industries, Inc., located in Jacksonville, Florida, has an opportunity for aProject Scheduler to support the development of space-to-space power beaming spacecraft and the Star Catcher Network, its orbital power grid. This role will be responsible for analyzing, planning, and executing design and implementation of systems or components used on spacecraft, satellites, and other space-related technologies.
Key Responsibilities:
Qualifications:
Preferred Skills:
Help us deploy and scale space infrastructure that will drive our utilization of space forward! We offer a highly competitive benefits package including access to comprehensive medical, dental, and vision coverage, 401(k) retirement plan, life insurance, and paid parental leave, in addition to other benefits.
Star Catcher is an Equal Opportunity Employer; employment with Star Catcher is governed on the basis of merit, competence and qualifications and will not be influenced in any manner by race, color, religion, gender, national origin/ethnicity, veteran status, disability status, age, sexual orientation, gender identity, marital status, mental or physical disability or any other legally protected status.
All offers of employment at Star Catcher are contingent upon results of a thorough background check and your ability to provide proof of eligibility to work in the US.
To conform to U.S. Government space technology export regulations, including the International Traffic in Arms Regulations (ITAR) you must be a U.S. citizen, lawful permanent resident of the U.S., protected individual as defined by 8 U.S.C. 1324b(a)(3), or eligible to obtain the required authorizations from the U.S. Department of State.