We use essential cookies

Please Accept our Privacy Policy

PROJECT SCHEDULER

MP NEXLEVEL LLC

Maple Lake, MN 55358 • 11/12/2026

Job Description

Job Description

Job Summary

We are looking for a detail-oriented Oracle Primavera P6 Scheduler with proven experience in scheduling fiber and telecommunications construction projects. The ideal candidate will play a key role in planning and coordinating complex, fast-paced initiatives critical to delivering high-performance infrastructure on time and within scope.

Duties and Responsibilities:

  • Develop, manage, and maintain project schedules in Oracle Primavera P6 for telecommunications, fiber infrastructure, and network connectivity projects.
  • Coordinate with cross-functional teams including construction managers, network engineers, vendors, and design teams to gather project requirements and progress updates.
  • Translate complex scopes of work into detailed WBS and logic-driven schedules.
  • Identify critical paths, schedule risks, and mitigation strategies to keep projects on track.
  • Integrate construction milestones, permit timelines, equipment delivery dates, and test windows into master schedules.
  • Produce schedule reports including look-ahead, resource analysis, and delay impact assessments.
  • Participate in project meetings and provide real-time schedule updates and forecasts.
  • Ensure all schedules align with corporate standards, customer requirements, and contract deliverables.
  • Safety training as required by position
  • Paperwork filing and maintenance as needed

Essential Education and Qualifications:

  • 3+ years of recent hands-on experience using Primavera P6 for complex infrastructure or construction projects.
  • 1+ recent years experience utilizing Microsoft project
  • Direct experience scheduling fiber optic installations, structured cabling is strongly preferred.
  • Solid understanding of construction sequencing, telecom installation workflows, and critical path scheduling.
  • Familiar with permitting timelines, long-lead material tracking, and resource leveling.
  • Effective communication and coordination skills; able to work across technical and non-technical teams.
  • Highly proficient with Microsoft Excel; experience with project documentation and reporting tools (e.g., Power BI, Smartsheet, or similar) is a plus.

Preferred Qualifications

  • Bachelor’s degree in construction management, Engineering, Telecommunications, or a related field.
  • (PMI-SP) – Certification preferred

Physical Demands:

The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

The main physical demands of this job include sitting at a desk/computer for long periods of time. Also, the job may require focusing on a computer screen for several hours at a time.

Hourly pay: $45-$69/hr based on relevant experience

Benefits offered to eligible employees include medical, dental, vision, and supplemental life insurance, along with Paid Time Off, paid Holidays, traditional and ROTH 401(k) options with company match, employee stock purchase plan, education assistance program, employee assistance program, training and development opportunities, Telecommunications Industry Registered Apprenticeship Program, and a Commercial Driver’s License obtainment program.