We use essential cookies

Please Accept our Privacy Policy

Substation Electrical Engineer

Critical Path Consultants, Inc.

Phoenix, AZ • 11/18/2026

Job Description

Job Description

About the job

Company Description Our client is a 100% employee-owned firm where engineers, construction professionals, architects, planners, technologists, and scientists collaborate to plan, design, and build impactful projects. Since 1898, the company’s mission has been to make clients successful by partnering on complex challenges and delivering innovative solutions. Team members bring an ownership mindset, contributing to safety performance that ranks among the top 5% of AEC firms. The firm is deeply engaged in the communities where it operates, supporting fundraising, cleanups, educational outreach, and mentorship, particularly in STEM fields. Applicants can expect a culture that values accountability, community involvement, and long-term professional growth.

Role Description

The Substation Electrical Engineer is a full-time, on-site role based in Phoenix, AZ, focused on the design and development of electrical substations and related power infrastructure. Day-to-day responsibilities include preparing detailed electrical designs, calculations, and drawings, as well as coordinating with multidisciplinary project teams to ensure compliance with industry standards and client requirements. The role involves performing power system studies, specifying equipment, reviewing vendor documentation, and supporting construction activities with technical guidance and field support as needed. The engineer will participate in project planning, cost estimates, and schedule management, while contributing to quality assurance and safety practices across all phases of a project. This position also offers opportunities to mentor junior team members and collaborate with clients to address technical challenges and optimize substation performance.

Qualifications

  • Strong foundation in electrical engineering principles, including electricity and Electrical Engineering.
  • Demonstrated experience in Electrical Design for substations or similar power infrastructure.
  • Knowledge of Power Systems analysis, including load flow, short-circuit, and protection coordination studies.
  • Understanding of Power Distribution systems and equipment such as transformers, breakers, and switchgear.
  • Bachelor’s degree in Electrical Engineering or a closely related discipline; advanced degree is a plus.
  • Professional Engineer (PE) licensure or progress toward licensure preferred.
  • Familiarity with relevant industry codes and standards (e.g., IEEE, NEC, NESC).
  • Proficiency with electrical design and modeling tools (e.g., AutoCAD, MicroStation, ETAP, or similar software).
  • Effective communication and collaboration skills, with the ability to work on multidisciplinary teams.
  • Commitment to safety, quality, and continuous learning in a fast-paced project environment.
\nCompany Description

Since 2016 and over $3M in sales in 2025 alone, Critical Path Consultants, Inc (CPC Staffing) specializes in sourcing elite engineering and technical professionals for long-term, high-level roles from project management and controls and engineering (mechanical, civil, structural, electrical, etc.), to industry-specific experts. We understand complex workplaces and deliver talent that drives innovation, safety, and precision across sectors like energy, aerospace, and software.

We go beyond quick fills by building strategic partnerships that support workforce continuity. Our curated network of credentialed professionals ensures clients receive smart, qualified talent who seamlessly integrate into specialized teams and elevate mission-critical projects.

Company Description

Since 2016 and over $3M in sales in 2025 alone, Critical Path Consultants, Inc (CPC Staffing) specializes in sourcing elite engineering and technical professionals for long-term, high-level roles from project management and controls and engineering (mechanical, civil, structural, electrical, etc.), to industry-specific experts. We understand complex workplaces and deliver talent that drives innovation, safety, and precision across sectors like energy, aerospace, and software.\n\nWe go beyond quick fills by building strategic partnerships that support workforce continuity. Our curated network of credentialed professionals ensures clients receive smart, qualified talent who seamlessly integrate into specialized teams and elevate mission-critical projects.